Green Register: Tour of a Low Energy New Build Home Near Bath

Date: Tuesday, 7th July 2026    Time: 15:30–17:30   Location: Marshfield

A 2-hour site visit with client and architects of a recently completed Passivhaus build in an historic Cotswold village.

Ian Walker of CaSA Architects will guide you around the finished house and present the design process from concept through to realisation on site, explaining how they overcame the challenges of planning, technical design and Passivhaus certification, and the lessons learnt.

They will outline the thermal performance predicted using PHPP compared to actual performance data, and the client will be on hand to talk and answer questions about their experience of living in a Passivhaus.

Technical project details:

  • Materials used – natural stone, natural slate and durable natural timber with timber/ aluminium composite windows and doors 
  • Structure – timber frame, ‘stick built’ on site 
  • A mixture of insulation materials were used from blown cellulose in the walls and the flat roof, mineral fibre in the loft, EPS in the floors with compac foam at thermal bridges and perinsul blocks to plinth walls 
  • Air tightness of 0.6 achieved using smartply along with membranes and tapes 
  • M&E includes – PVs with battery storage, air source heat pump, MVHR and smart controls for lighting and blinds 
  • Shading design to prevent overheating is a mixture of fixed shading and external blinds 

Details and booking information via The Green Register website 